Enter prize draw to win Apple iPad mini 4 on Heatload’s stand at Data Centre World

images_DaveWolfenden

HeatLoad has increased its rental stock of 3.5kW rack mounted load banks to over 600 units. The company now has 8.6MW of rack mounted load banks and 8MW of floor standing load banks. This is all very timely in preparation for what promises to be a very busy and successful Data Centre World 2016. According to Dave Wolfenden (pictured), managing director of HeatLoad, the company has seen an explosion in data centre testing this year – which has increased by 50 per cent in the first quarter of 2016.

‘We are not entirely sure whether this is due to the company name change towards the end of last year (from Mafi Mushkila), market growth, or an upturn in the economy, but 2016 is already looking to be a very successful year for us,’ commented Wolfenden.

Dave Wolfenden will be presenting a paper on Day 1 at 13.15 in the Design and Build Theatre on Best Practices in Data Centre Testing.

For further information visit: www.heatload.co.uk

  • Show Comments

You May Also Like

images_KateCWood

Do we really need Icelandic data centres?

Do we really need Icelandic data centres? Kate Craig-Wood, MD of Memset.com, who has built her ...

EcoCooling joins the Node Pole Alliance

EcoCooling joins the Node Pole Alliance EcoCooling has joined the Node Pole Alliance, an ...

images_Xiria

Xiria selects colocation from Datum Datacentres to support growth

Xiria selects colocation from Datum Datacentres to support growth IT services company Xiria has ...

Share This